Practical guides on structural engineering, inspections, drainage and building work.
Foundations
Dewatering is needed when a Perth excavation goes below the water table. Small, short jobs may be licence-exempt; discharge may need its own approval.
Foundations
A compaction test on Perth sand uses the Perth sand penetrometer (AS 1289.6.3.3). Under the NCC, sand fill under a slab needs 7 or more blows per 300 mm.
Building methods
Double brick walls are two brick leaves with a cavity; brick veneer is one non-loadbearing brick leaf tied to a timber or steel frame.
Retaining walls
In WA a limestone retaining wall needs a building permit if it retains over 0.5 m, is tied to other building work or affects a neighbour's land.
Foundations
A strip footing is a continuous reinforced concrete beam under walls. On Class A sand sites, the National Construction Code's standard is 300 mm deep.